The Environmental and Operational Requirements of Well Pad Installation

RDR was awarded an 8-month natural gas well pad construction project in West Virginia that involves more than 150,000 cubic yards of earthwork and a fully engineered access road.
When to Use HDD or Auger Boring Trenchless Installations

RDR’s directional drilling division was chosen for an auger boring (or a bore & jack) installation of a 700 foot water transfer line that will pass under heavily traveled Route 2 near the Ohio River. The project will be completed in under one month, enabling infrastructure expansion in a smarter, greener and more sustainable way.
HDD Creates Path for Utilities with Minimal Surface Disruption

RDR’s Directional Drilling division is beginning a year-long trenchless 19,100 foot sewer system expansion accomplished with HDD. The expansion includes construction of air release valves and manholes. HDD was found to be quicker, more economical and will create far less disruption than open cut or trenched options.